Track Record

Projects

Proven delivery across multiple submarine cable repair projects spanning Cambodia, Thailand, and Malaysia.

Illustration: bmh restoration work at a cable landing point
Illustrative image

2026BMH restoration

Asia-America Gateway (AAG) Cable

Repair and restoration works at the Beach Manhole (BMH) for the AAG cable system.

Location
Mersing, Johor, Malaysia
Client
TM (Telekom Malaysia)
COTSB role
Contractor and consultancy services
Status
Completed
Illustration: aag cable work at a cable landing point
Illustrative image

2024AAG cable

Asia-America Gateway (AAG) Cable

Shore-end repair works for the AAG cable system at the Thailand landing point.

Location
Sri Racha, Thailand
Client
NT Thailand
COTSB role
Contractor and consultancy services
Status
Completed
Illustration: shore-end repair work at a cable landing point
Illustrative image

2023Shore-end repair

MCT Cable

Contractor and consultancy services for shore-end cable repair and restoration.

Location
Sihanoukville, Cambodia
Client
MCT
COTSB role
Contractor and consultancy services
Status
Completed

Experience

Cable systems experience

  • SMW3
  • SMW4
  • APCN2
  • SAFE
  • AAG
  • SKR1M